Skip to main content

Rincon Valley USD

Excellence in Education

Measure G Banner

Sequoia Elementary: Campus Upgrades

Front of school

A bright green lawn stretches between two single-story school buildings under a clear blue sky.

Outside Classroom

A modern classroom features a large central TV screen flanked by whiteboards above wooden cabinets.

Spring Lake Middle School: Campus Upgrades

A single-story white building with a blue roof under a clear blue sky, featuring a green sculpture and purple flowers in the foreground.

A white building with a large green sign featuring stylized wings under a bright blue sky.

Covered hallway

A clean and well-lit meeting room with long tables and grey carpet.

Austin Creek Elementary: Playground

A sunny school courtyard with a large asphalt area and surrounding cream-colored buildings.

A playground structure is under construction with blue climbing frames and ladders.

A sunny outdoor playground features a blue shade structure over climbing equipment and slides on a green turf field.

A sunny outdoor playground features a blue and white climbing structure sheltered by a large blue canopy.

Austin Creek Elementary: Fencing

Outside fence

Front of school fence

Field fence

field fence 2

Manzanita Elementary: Early Education Classrooms

A yellow excavator operates on a muddy construction site under a partly cloudy sky.

Framing of classrooms

A modern single-story building featuring vertical wooden siding and a row of windows under a clear sky.

New Classrooms

Manzanita Elementary: Playground

An aerial view of a building with solar panels and a playground.

An aerial view of a school campus with a playground and buildings.

An aerial view of a modern building with solar panels on the roof.

An aerial view shows a modern building with a rooftop garden and solar panels.

Manzanita Elementary: Parking Lot

Construction vehicles, including bulldozers and a white truck, operate on a dirt lot under a clear blue sky.

Construction workers pave a new road with fresh asphalt and concrete curbs under a bright sky.

An empty parking lot with white directional arrows painted on the asphalt under a clear blue sky.

An empty paved parking lot with white painted lines under a bright blue sky.

Elementary Schools: Drinking Fountains

A vertical pipe is secured in a freshly poured concrete patch on the ground.

A row of four stainless steel drinking fountains is mounted on a white wall outdoors.

A modern silver water fountain with a built-in bottle filling station stands outdoors.

A stainless steel Elkay water fountain and bottle filling station mounted on a wall.

Investing in the Future of Rincon Valley Schools

Investing in the Future of Rincon Valley Schools

  • At Rincon Valley Union School District (RVUSD), we are proud of our strong tradition of academic excellence. Our dedicated teachers and staff work every day to ensure students receive a high-quality education that prepares them for success in high school, college, and beyond.

  • We believe in nurturing well-rounded, lifelong learners who are ready to contribute positively to their community.

    Great schools don’t just benefit students — they strengthen our neighborhoods and protect the value of our homes.

    Measure G: Real Progress, Real Results

    Thanks to the support of Rincon Valley voters, Measure G, passed in March 2024, is already making a visible impact across our campuses.

  • This $66 million bond is funding critical school improvements — all at a cost of no more than $30 per $100,000 of a property’s assessed value per year.

  • Over the past two years, RVUSD worked closely with families, teachers, and community members to develop a 10-year Master Facilities Plan that prioritizes safety, modernization, and learning spaces that meet the needs of today’s students.
     

    See the photo gallery above to view completed projects funded by Measure G, including:

    • A brand-new Transitional Kindergarten (TK) classroom, built with our youngest learners in mind

    • New parking lot to improve safety and traffic flow

    • A modernized TK/K playground, designed for safe, age-appropriate play

    • New hydration stations across school sites to support student health and reduce plastic waste
       

    What Measure G Will Continue to Support

    • Replacing aging roofs, heating/cooling systems, plumbing, and electrical infrastructure

    • Upgrading and expanding classrooms, including new STEM and science labs

    • Modern classroom technology that supports 21st-century learning

    • Additional TK classrooms with bathrooms

    • Improved space and resources for students with learning disabilities

    • Replacing temporary portables with safe, permanent classroom buildings
       

    Committed to Fiscal Responsibility

    Measure G includes strong accountability measures to ensure every dollar is spent as promised:

    • All funds stay local — none can be taken by the State

    • No money can be used for administrator salaries

    • A detailed project list is required and publicly available

    • Oversight by an Independent Citizens’ Oversight Committee

    • Mandatory annual audits for financial and performance transparency
       

    We are grateful to our Rincon Valley community for investing in our schools. These improvements are just the beginning, and your support is helping create safer, more modern learning environments for every student.